What Soja & Co needed, the scope of the engagement and the systems implemented, which were Katana MRP. It is an implementation record rather than a measured case study.
Artisan candles and wellness products · Project
Soja & Co produces handmade soy wax candles and natural wellness products. LevelOps implemented Katana MRP across a sustained 2023 engagement.
Soja & Co makes candles by hand from natural soy wax, with a product range built on original fragrances and a stated priority on environmental sustainability. Handmade production that is growing runs into the same wall every time: the craft scales only as far as the planning behind it, and pouring, curing and finishing each hold their own timing that a spreadsheet does not track.
LevelOps implemented Katana MRP for Soja & Co. The work was not run as a one off install: it sat inside an ongoing 2023 mandate under the Programme Essor framework, roughly sixteen hours a week over twenty six weeks, which left room to move the operation onto the system rather than only switch it on.
Closed in March 2023.
Closed in June 2023, continuing the same engagement.
What Soja & Co needed, the scope of the engagement and the systems implemented, which were Katana MRP. It is an implementation record rather than a measured case study.
Because we did not measure them. Publishing a gain we never instrumented would be inventing one, so the page records what was done and stops there.
Likely, if you are on comparable systems. Describe your situation through the contact page and say what you already run, and we will tell you whether Katana MRP is the right starting point.
Implementation work puts the management system in place. PDF to Order handles the step before it, getting orders that arrive as documents into the system. Some clients have both, many have only one.
Ask through the contact page. We check with the client before passing on any contact, so it depends on what they agree to.